Integrated energy systems

Energy that never stops.

Energy that isn't managed is wasted - in time, in cost, in vehicles standing idle.

Principles

Three principles we don't negotiate.

  • Sized for real use.

    Sized from real load profiles, with growth headroom, so it won't go obsolete halfway through its service life.

  • Integrates, doesn't replace.

    Existing inverters, panels and boards stay where they are, no unnecessary swaps, no extra cost.

  • Certified, safe, European.

    We work only with certified, safe materials of European origin. Quality and guarantees we never compromise on.

In numbers

The numbers speak for themselves.

94% self-consumption

Residential systems pairing storage with solar production.

45% peak reduction

Peak shaving on industrial connections with high contracted power.

98% fleet uptime

AGVs and forklifts with centralised charge management.

5+ sectors

Real installations across industry, residential, institutional, agriculture and logistics.

Results from real installations; every project is sized individually during the diagnosis phase.

Partners

Proven technology.

Certified and integrated with Europe's leading manufacturers of energy storage and electric mobility.

Questions

Direct questions. Direct answers.

How is a system's capacity sized?

It depends on the consumption profile, the solar production to integrate and the critical loads to protect. In practice it falls into three scales — residential (5–15 kWh), commercial (20–100 kWh) and industrial (100+ kWh). The initial technical diagnosis sizes the right capacity for your case, with no commitment.

How do you calculate the investment payback?

During sizing, we calculate your payback from your real consumption profile, the applicable tariffs (12-month OMIE or fixed) and self-consumption scenarios. In practice: 5–9 years for residential with existing solar; 4–7 years for businesses on two- or three-rate tariffs.

Does EnbiPower integrate with existing solar plants?

Yes. We study integrability with your existing installation — inverters, panels and boards already in place — and define the right path: retrofit, expansion or complement. Integration is part of the project, not a paid upgrade on the side.

How are monitoring and control handled after installation?

Baseline monitoring and control run on the equipment manufacturers' own platforms. When it makes sense to centralise management, Enbiente is available to integrate those systems into its own management and control platforms.

What is the real geographic coverage of Enbiente engineers?

Headquartered in Viseu, with a mobile team for projects across mainland Portugal and the islands. The initial diagnosis is conducted remotely; installation and commissioning are always on-site.

We come back with a concrete analysis.

Talk to us